Connectivity Engineer - Data Center Construction | Ingénieur en connectivité - Construction de centres de données
- Vancouver, BC
- On-site
- Posted May 6, 2026
- 1 position
$104,000–$142,000 / year
Opens an external site
- Employment type
- Full-time
- Experience level
- Senior · 5+ years
- Posting language
- English
- Working hours
- 40 hours per week
Job summary
Manage the full lifecycle of data center connectivity projects, ensuring they are executed on schedule, within budget, and meet quality standards. Coordinate between cross-functional partners, vendors, and on-site contractors to deliver physical telecommunications infrastructure.
Job details
Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta ’s global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta ’s server banks. The DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally. ------- Meta recherche un ingénieur en connectivité pour rejoindre l’équipe de conception, d'ingénierie et de construction (DEC). Nos centres de données constituent le socle sur lequel reposent nos services et notre infrastructure en pleine expansion. L'équipe assure le bon fonctionnement des centres de données mondiaux de Meta, en fournissant l'infrastructure physique qui relie le monde aux vidéos, aux flux et aux autres informations stockées sur les parcs de serveurs de Meta. L’ingénieur en connectivité de DEC fournira un soutien sur site afin de garantir que les projets de télécommunications de DEC soient exécutés dans les délais impartis, dans le respect du budget et au niveau de qualité spécifié. L'ingénieur en connectivité sera l'interlocuteur privilégié pour la gestion de l'ensemble du cycle de vie du projet, depuis son lancement jusqu'à la mise en service et le transfert aux opérations. L’ingénieur en connectivité de DEC collabore étroitement avec des partenaires interfonctionnels au siège du centre de données, notre sous-traitant sur site et d’autres centres de données dans le monde entier. Responsibilities Project Planning & Control - Create, maintain, and report on site project and program scope, schedules and milestones. Work closely with site project management team throughout the project lifecycle from the creation of project and program plans through project close out | Planification et suivi de projet : définir, mettre à jour et rendre compte de la portée, des calendriers et des étapes clés des projets et programmes sur site. Travailler en étroite collaboration avec l’équipe de gestion de projet du site tout au long du cycle de vie du projet, de la création des plans de projet et de programme jusqu’à la clôture du projet. Learnings - Continually review ongoing projects for efficiencies in schedule, budget, and opportunities to enable cross-functional partners to be successful. Document data points to assist with field coordination of projects. Support development of project management best practices and initiatives, coordinating SOPs/SIPs with vendors, and participating in global and regional standards. Coordinate lessons learned with the internal and external cross functional partners | Enseignements tirés : examiner en permanence les projets en cours afin d'optimiser les délais et le budget, et d'identifier les opportunités permettant aux partenaires interfonctionnels de mener à bien leurs missions. Documenter les points de données pour faciliter la coordination des projets sur le terrain. Soutenir le développement des meilleures pratiques et des initiatives en matière de gestion de projet, en assurant la coordination des procédures opérationnelles standard (POS) et des plans d'exécution (PDE) avec les fournisseurs, et en participant à l'élaboration de normes mondiales et régionales. Coordonner les enseignements tirés avec les partenaires interfonctionnels internes et externes Forecasting - Support project controls team with forecasting and budget efforts as required. Share current project status with upstream and downstream partners, ensuring crisp and complete handoffs between teams | Prévisions – Apporter un soutien à l’équipe de contrôle de projet en matière de prévisions et de budget, selon les besoins. Partager l'état d'avancement actuel du projet avec les partenaires en amont et en aval, afin de garantir des transferts clairs et complets entre les équipes. Technical Reviews - Establish milestones for equipment purchase and track and report against these milestones Assist with the selection and review of a contractor to support the structured cabling work within a data center | Évaluations techniques : définir des étapes clés pour l'achat d'équipements, assurer leur suivi et rendre compte de leur avancement ; participer à la sélection et à l'évaluation d'un prestataire chargé des travaux de câblage structuré au sein d'un centre de données. Metrics - Report progress and risks on site projects and other initiatives to key stakeholders | Indicateurs – Rendre compte des progrès et des risques liés aux projets sur site et autres initiatives aux principales parties prenantes Workflow - Work with installation partners to establish and track milestones. Conduct pre-project planning, project handoffs, and ensure design delivery and verification. Identify and respond to project risks and high-priority issues rapidly and effectively through effective action and appropriate escalation. Track and manage project change order requests | Processus de travail : collaborer avec les partenaires d’installation pour établir et suivre les jalons. Effectuer la planification préliminaire du projet, la passation de projet et assurer la livraison et la vérification de la conception. Identifier les risques liés au projet et les problèmes hautement prioritaires, et y répondre rapidement et efficacement grâce à des mesures concrètes et à une remontée hiérarchique appropriée. Suivre et gérer les demandes d'ordre de modification de projet. Vendor Field Management - Responsible for all connectivity activities within construction, projects on site including tracking and reporting actual progress related to schedule expectations. Set and communicate clear expectations together with the immediate site team, build key relationships with our installation partners, foster a safe, collaborative working environment and execute a goal of ‘right first time.’ | Gestion des prestataires sur le terrain : chargé de toutes les activités liées à la connectivité dans le cadre des travaux de construction et des projets sur site, y compris le suivi et le compte rendu de l'avancement réel par rapport au calendrier prévu. Définir et communiquer des attentes claires en collaboration avec l'équipe de chantier, établir des relations solides avec nos partenaires d'installation, favoriser un environnement de travail sûr et collaboratif, et mettre en œuvre notre principe « bien faire du premier coup ». Quality Assurance - Perform physical inspections to ensure vendor work meets DEC quality standards throughout the lifecycle of the data center. Validate physical installs, test reports, build accuracy, material and local code compliance including constructability reviews on multiple design phases | Assurance qualité - Effectuer des inspections physiques pour s’assurer que le travail du fournisseur respecte les normes de qualité DEC tout au long du cycle de vie du centre de données. Valider les installations physiques, les rapports d’essais, l’exactitude de la construction, la conformité des matériaux et des codes locaux, y compris les analyses de constructibilité lors de plusieurs phases de conception. Technical Field Lead - Technical lead for industry and Meta standards, responsible to lead product evaluation, design, and installation methods in the field including scope clarification, design and installation details as the owner of the Request for Information process | Responsable technique sur le terrain : responsable technique des normes industrielles et de Meta, chargé de diriger l’évaluation des produits, la conception et les méthodes d’installation sur le terrain, y compris la clarification du périmètre, les détails de conception et d’installation, en tant que responsable du processus de demande de renseignements. Technical Coordination - Develop solutions to in-field scope-gap or clash issues. Partner with DEC design and engineering teams to digitally support design reviews, BOM reviews, and as-built drawing validations | Coordination technique : élaborer des solutions aux problèmes de lacunes ou de conflits de périmètre sur le terrain. Collaborer avec les équipes de conception et d'ingénierie de DEC pour faciliter numériquement les revues de conception, les revues de nomenclatures et la validation des plans de mise en œuvre. Communications & Cross functional team engagement - Liaise with construction partners to ensure deliverables are met during new builds and retrofits. Coordinate with logistics partners, vendors, and suppliers to ensure a smooth end to end flow of materials as needed. Work closely with the relevant teams to proactively communicate progress and project risks and initiatives to key stakeholders | Communication et collaboration interfonctionnelle - Assurer la liaison avec les partenaires de construction pour garantir le respect des livrables lors des nouvelles constructions et des rénovations. Coordonner avec les partenaires logistiques, les vendeurs et les fournisseurs afin d’assurer un flux de matériaux fluide de bout en bout, selon les besoins. Collaborer étroitement avec les équipes concernées afin de communiquer de manière proactive les progrès, les risques et les initiatives liés aux projets aux principales parties prenantes. Safety - Ensure that vendors adhere to safety obligations in accordance with local regulations and DEC Safety best practices. Lead a 'safety first' experience while working with others, in support of shared goals. Foster an environment of open and transparent communication while acknowledging demonstrated experience in EHS practices | Sécurité : s’assurer que les entrepreneurs respectent leurs obligations en matière de sécurité conformément à la réglementation locale et aux meilleures pratiques de sécurité de DEC. Mener une expérience « la sécurité d'abord » tout en collaborant avec les autres, afin de soutenir des objectifs communs. Favoriser un environnement de communication ouverte et transparente tout en reconnaissant l’expérience démontrée en matière de pratiques EHS Minimum Qualifications Experience engaging and guiding stakeholders | Expérience en mobilisation et orientation des parties prenantes Experience with MS Office (Word, Excel, and PowerPoint) and MS Project | Expérience avec MS Office (Word, Excel et PowerPoint) et MS Project 7+ years experience in project management | Plus de 7 ans d’expérience en gestion de projet Experience providing solutions to construction related problems | Expérience dans la fourniture de solutions aux problèmes liés à la construction Preferred Qualifications Experience with Primavera 6 | Expérience avec Primavera 6 Experience reviewing and leading installations to design documents and specifications | Expérience dans la supervision et la direction d’installations selon les documents et spécifications de conception Experience with fiber optic testing at scale inclusive of complex troubleshooting | Expérience en matière de tests de la fibre optique à grande échelle, y compris le dépannage complexe Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements) | Capacité avérée à intégrer des outils d'IA afin d'optimiser/de redéfinir les flux de travail et de générer des résultats considérables (par exemple, gains d'efficacité, amélioration de la qualité) Data center development and/or construction management experience | Expérience en développement et/ou en gestion de la construction de centres de données Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews) | Expérience en matière de respect et de mise en œuvre de pratiques d’IA responsables et éthiques (par exemple, évaluation des risques, atténuation des biais, contrôles de qualité et d’exactitude) Experience managing IT or IP Network deployment projects in a mission critical environment requiring coordination across multiple disciplines for the delivery of a common goal | Expérience dans la gestion de projets de déploiement de réseaux informatiques ou IP dans un environnement critique nécessitant une coordination entre plusieurs disciplines pour atteindre un objectif commun Experience with Quality Assurance and Quality Control, including progressive inspections and acceptance | Expérience en assurance qualité et contrôle qualité, y compris les inspections progressives et l’acceptation Experience in leading deployments of Network/Structure cabling infrastructure | Expérience dans la direction de déploiements d’infrastructures de câblage réseau et structuré Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologies | Une volonté manifeste de perfectionner en permanence ses compétences en IA (par exemple, ingénierie des invites et du contexte, orchestration d'agents) et de se tenir informé des dernières avancées en matière de technologies d'IA Experience with outside plant cabling (OSP) deployments including OTDR/OLTS testing | Expérience des déploiements de câblage extérieur (DCE), y compris les tests OTDR/OLTS Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements) Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews) Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologies CA$104,000/year to CA$142,000/year + bonus + equity + benefits
What you’ll do
Manage the full lifecycle of data center connectivity projects, ensuring they are executed on schedule, within budget, and meet quality standards. Coordinate between cross-functional partners, vendors, and on-site contractors to deliver physical telecommunications infrastructure.
Requirements
Requires over 7 years of project management experience and proficiency in MS Office and MS Project. Preferred candidates have experience in data center construction, fiber optic testing, and the integration of AI tools for workflow optimization.
Benefits
- Bonus
- Equity
- Benefits
Listed skills
- Project management · Preferred
Other relevant skills
Identified from the job description. Confirm important requirements above.
- Project Management
- Structured Cabling
- Fiber Optic Testing
- Vendor Management
- Quality Assurance
- Technical Coordination
- Budget Forecasting
- Risk Management
- MS Project
- Primavera 6
- AI Workflow Optimization
- Outside Plant Cabling
- EHS Practices
- Construction Management
- Network Deployment
- Stakeholder Engagement
Job areas
- Engineering
- Construction
- Technology
- Management & Leadership
- Logistics
More jobs from Meta
Data Engineer, Analytics | Ingénieur de données, analytique
- On-site
- Toronto, ON
- Posted Oct 1, 2026
Research Engineer, AI (University Grad) | Ingénieur de recherche en IA (diplômé universitaire)
- On-site
- Montréal, QC
- Posted Sep 12, 2026
Software Engineer, Systems ML - Frameworks / Compilers / DL-Kernels | Ingénieur logiciel spécialisé en apprentissage automatique des systèmes – cadres/compilateurs/noyaux d'apprentissage profond
- On-site
- Toronto, ON
- Posted Aug 28, 2026
Silicon Engineer | Ingénieur·e en puces
- On-site
- Toronto, ON
- Posted Jun 29, 2026